The word algorithm is derived from the name of which mathematician?
- A.Euclid
- B.Al-Khwarizmi
- C.Charles Babbage
- D.Blaise Pascal
Correct answer
Explanation
The correct answer is B, Al-Khwarizmi. Muhammad ibn Musa al-Khwarizmi was a ninth-century Persian mathematician and astronomer whose treatise on calculation with Hindu-Arabic numerals reached Europe in Latin translation; his Latinised name produced the word algorithm, and another of his works gave the word algebra. Option A is wrong because Euclid is remembered for geometry and for the Euclidean algorithm for the greatest common divisor, but the word itself does not come from his name. Option C is wrong because Charles Babbage designed the Difference Engine and the Analytical Engine and is called the father of the computer, not the source of this word. Option D is wrong because Blaise Pascal built the Pascaline, an early mechanical adding machine, and has a programming language named after him. Expect this as a one-mark definition question.
Read the full article: Algorithms, Flowcharts and SDLC: Symbols, Models and PYQs
Practice Questions
View allWhich symbol is used to represent a decision in a flowchart?
- A.Oval
- B.Rectangle
- C.Diamond
- D.Parallelogram
Show answer
The diamond or rhombus is the decision symbol: it holds a condition and has one entry with two exits, marked Yes and No, so the flow branches according to the test.
Read the full explanation →In a flowchart, the oval or rounded shape is used to show:
- A.Start and Stop
- B.A subroutine call
- C.A decision
- D.The direction of flow
Show answer
The oval is the terminal symbol, and a well-formed flowchart has exactly one Start terminal and at least one Stop terminal; a chart that can never reach a Stop describes an infinite loop and so breaks the finiteness property of an algorithm.
Read the full explanation →The worst-case time complexity of binary search on a sorted array of n elements is:
- A.O(n)
- B.O(n log n)
- C.O(log n)
- D.O(n squared)
Show answer
Binary search compares the key with the middle element and throws away half the array at every step, so the number of comparisons grows with the logarithm of the array size; an array of a million sorted items needs about twenty comparisons.
Read the full explanation →What is the other name of Linear Sequential model in software engineering?
- A.Spiral model
- B.Prototype model
- C.Waterfall model
- D.RAD model
Show answer
The Waterfall model is called the linear sequential model because the project flows in one direction through requirement analysis, design, coding, testing, deployment and maintenance, with each phase completed and signed off before the next begins and no overlap between them.
Read the full explanation →Which phase of the software development life cycle produces the Software Requirements Specification (SRS)?
- A.Requirement gathering and analysis
- B.Design
- C.Coding
- D.Maintenance
Show answer
This is the first phase of the SDLC: the team meets the users, records what the system must do and what constraints apply, and sets it all down in the Software Requirements Specification, which then becomes the agreed basis for everything that follows and the yardstick for acceptance testing.
Read the full explanation →