Skip to content
GK24
Computer AwarenessEasy

In a flowchart, the oval or rounded shape is used to show:

  1. A.Start and Stop
  2. B.A subroutine call
  3. C.A decision
  4. D.The direction of flow

Correct answer

A. Start and Stop

Explanation

The correct answer is A, Start and Stop. The oval is the terminal symbol, and a well-formed flowchart has exactly one Start terminal and at least one Stop terminal; a chart that can never reach a Stop describes an infinite loop and so breaks the finiteness property of an algorithm. Option B is wrong because a subroutine or module call is shown by the predefined process symbol, a rectangle with double lines along its sides. Option C is wrong because a decision is shown by the diamond, which branches into Yes and No. Option D is wrong because the direction of flow is shown by the arrow or flow line, which carries the eye from one symbol to the next; by convention the chart is read from top to bottom and from left to right. Learning the seven standard symbols covers almost every flowchart question.

Read the full article: Algorithms, Flowcharts and SDLC: Symbols, Models and PYQs

View all
Q2.Computer AwarenessEasy

The word algorithm is derived from the name of which mathematician?

  1. A.Euclid
  2. B.Al-Khwarizmi
  3. C.Charles Babbage
  4. D.Blaise Pascal
Show answer
Correct answer: B. Al-Khwarizmi

Muhammad ibn Musa al-Khwarizmi was a ninth-century Persian mathematician and astronomer whose treatise on calculation with Hindu-Arabic numerals reached Europe in Latin translation; his Latinised name produced the word algorithm, and another of his works gave the word algebra.

Q4.Computer AwarenessAsked in: Delhi · 7 Aug 2021, Shift 1Medium

What is the other name of Linear Sequential model in software engineering?

  1. A.Spiral model
  2. B.Prototype model
  3. C.Waterfall model
  4. D.RAD model
Show answer
Correct answer: C. Waterfall model

The Waterfall model is called the linear sequential model because the project flows in one direction through requirement analysis, design, coding, testing, deployment and maintenance, with each phase completed and signed off before the next begins and no overlap between them.

Q5.Computer AwarenessEasy

Which phase of the software development life cycle produces the Software Requirements Specification (SRS)?

  1. A.Requirement gathering and analysis
  2. B.Design
  3. C.Coding
  4. D.Maintenance
Show answer
Correct answer: A. Requirement gathering and analysis

This is the first phase of the SDLC: the team meets the users, records what the system must do and what constraints apply, and sets it all down in the Software Requirements Specification, which then becomes the agreed basis for everything that follows and the yardstick for acceptance testing.