Skip to content
GK24
Computer AwarenessEasy

Which symbol is used to represent a decision in a flowchart?

  1. A.Oval
  2. B.Rectangle
  3. C.Diamond
  4. D.Parallelogram

Correct answer

C. Diamond

Explanation

The correct answer is C, diamond. The diamond or rhombus is the decision symbol: it holds a condition and has one entry with two exits, marked Yes and No, so the flow branches according to the test. Option A is wrong because the oval, also drawn as a rounded rectangle, is the terminal symbol used only for Start and Stop. Option B is wrong because the rectangle is the process symbol, used for a calculation or an assignment such as adding two numbers and storing the sum. Option D is wrong because the parallelogram is the input or output symbol, used when a value is read from the user or a result is printed. Candidates most often swap the rectangle and the parallelogram, so fix the pair in memory: rectangle does the work, parallelogram talks to the outside world, and the diamond decides.

Read the full article: Algorithms, Flowcharts and SDLC: Symbols, Models and PYQs

View all
Q1.Computer AwarenessEasy

In a flowchart, the oval or rounded shape is used to show:

  1. A.Start and Stop
  2. B.A subroutine call
  3. C.A decision
  4. D.The direction of flow
Show answer
Correct answer: A. Start and Stop

The oval is the terminal symbol, and a well-formed flowchart has exactly one Start terminal and at least one Stop terminal; a chart that can never reach a Stop describes an infinite loop and so breaks the finiteness property of an algorithm.

Q2.Computer AwarenessEasy

The word algorithm is derived from the name of which mathematician?

  1. A.Euclid
  2. B.Al-Khwarizmi
  3. C.Charles Babbage
  4. D.Blaise Pascal
Show answer
Correct answer: B. Al-Khwarizmi

Muhammad ibn Musa al-Khwarizmi was a ninth-century Persian mathematician and astronomer whose treatise on calculation with Hindu-Arabic numerals reached Europe in Latin translation; his Latinised name produced the word algorithm, and another of his works gave the word algebra.

Q4.Computer AwarenessAsked in: Delhi · 7 Aug 2021, Shift 1Medium

What is the other name of Linear Sequential model in software engineering?

  1. A.Spiral model
  2. B.Prototype model
  3. C.Waterfall model
  4. D.RAD model
Show answer
Correct answer: C. Waterfall model

The Waterfall model is called the linear sequential model because the project flows in one direction through requirement analysis, design, coding, testing, deployment and maintenance, with each phase completed and signed off before the next begins and no overlap between them.

Q5.Computer AwarenessEasy

Which phase of the software development life cycle produces the Software Requirements Specification (SRS)?

  1. A.Requirement gathering and analysis
  2. B.Design
  3. C.Coding
  4. D.Maintenance
Show answer
Correct answer: A. Requirement gathering and analysis

This is the first phase of the SDLC: the team meets the users, records what the system must do and what constraints apply, and sets it all down in the Software Requirements Specification, which then becomes the agreed basis for everything that follows and the yardstick for acceptance testing.