The Sivok-Rangpo railway line, once operational, will provide the first railway connectivity to which state?
- A.Arunachal Pradesh
- B.Mizoram
- C.Sikkim
- D.Nagaland
Correct answer
Explanation
The correct answer is Sikkim. The Sivok-Rangpo new line will give Sikkim direct railway connectivity, and the completion of excavation in all 14 tunnels was presented as a milestone towards that goal. The alignment passes through the Darjeeling and Kalimpong districts of West Bengal before entering the Pakyong district of Sikkim, and at Sivok it will join the existing New Jalpaiguri-Alipurduar route, which is what links the state to the national railway network. For residents and tourists it is expected to be a safer, faster and more reliable option than National Highway 10. Options A, B and D name other states of the region that are not served by this particular alignment; the project as described runs only through West Bengal and Sikkim, so none of them is the answer here.
Read the full article: Sivok-Rangpo Rail Line: Excavation Done in All 14 Tunnels
Practice Questions
How many tunnels are there on the Sivok-Rangpo new line railway project, in all of which excavation is now complete?
- A.10 tunnels
- B.14 tunnels
- C.23 tunnels
- D.45 tunnels
Show answer
The breakthrough in Tunnel No. 10, the longest on the alignment at 5.3 km, completed the excavation of all 14 tunnels on the project, which is why Railways described it as a major milestone for rail connectivity to Sikkim.
Read the full explanation →Roughly what share of the Sivok-Rangpo route length is made up of tunnels?
- A.About 45 per cent
- B.About 60 per cent
- C.About 86 per cent
- D.About 95 per cent
Show answer
The line traverses geographically challenging Himalayan mountain terrain, and its 14 tunnels account for roughly 86 per cent of the total route length, an unusually high proportion that explains why the completion of tunnelling is the decisive engineering step on this project.
Read the full explanation →The 125-km Rishikesh-Karnaprayag railway line mentioned alongside the Gangasagar project is being built in which state?
- A.Himachal Pradesh
- B.Uttar Pradesh
- C.Uttarakhand
- D.West Bengal
Show answer
The Rishikesh-Karnaprayag line, about 125 km long, is being developed through the Garhwal region of Uttarakhand; it passes through Rudraprayag district and joins Rishikesh with destinations such as Devprayag and Karnaprayag.
Read the full explanation →Gangasagar, the destination of the newly surveyed railway line, is located on which island?
- A.Majuli
- B.Sagar Island
- C.Sriharikota
- D.Diu
Show answer
Gangasagar stands on Sagar Island in West Bengal, and the new line, once built, will extend rail connectivity towards that island.
Read the full explanation →The major bridge on the approved Kakdwip-Gangasagar railway line will cross which river?
- A.Hooghly
- B.Muriganga
- C.Damodar
- D.Subarnarekha
Show answer
The new line between Kakdwip and Gangasagar will run for roughly 34 km and will include a major bridge of about 4.5 km built across the River Hooghly; that crossing is expected to be among the longest railway bridges in the country once it is complete.