Roughly what share of the Sivok-Rangpo route length is made up of tunnels?

  1. A.About 45 per cent
  2. B.About 60 per cent
  3. C.About 86 per cent
  4. D.About 95 per cent

Correct answer

C. About 86 per cent

Explanation

The correct answer is about 86 per cent. The line traverses geographically challenging Himalayan mountain terrain, and its 14 tunnels account for roughly 86 per cent of the total route length, an unusually high proportion that explains why the completion of tunnelling is the decisive engineering step on this project. The remaining works are tunnel lining, track laying and the installation of essential railway safety systems. Option A repeats the route length of 45 km as if it were a percentage, a common trap. Options B and D are plausible but incorrect figures; the first understates and the second overstates the tunnelled share. Candidates should hold the set of figures together: 45 km of route, 14 tunnels, 23 bridges, the 5.3-km Tunnel No. 10 and the 86 per cent tunnel share.

Read the full article: Sivok-Rangpo Rail Line: Excavation Done in All 14 Tunnels