NHAI Sets Standard Design for Multi-Lane Free Flow Toll Plazas

NHAI issued guidelines on 6 November 2026 to standardise the design of barrier-less Multi-Lane Free Flow toll plazas on National Highways of four lanes and more.

By Published · Updated · 2 min read
NHAI Sets Standard Design for Multi-Lane Free Flow Toll Plazas — GK24 title card

Why in News

On 6 November 2026 NHAI issued a policy circular standardising the design and infrastructure of barrier-less Multi-Lane Free Flow toll plazas on four-lane and wider National Highways, for upcoming and ongoing projects.

The National Highways Authority of India (NHAI), under the Ministry of Road Transport and Highways, has issued guidelines that fix a common design and infrastructure standard for Multi-Lane Free Flow (MLFF) toll plazas. The policy circular, made public on 6 November 2026, applies to National Highways with four lanes or more.

What MLFF tolling is

In an MLFF system there is no barrier at the plaza. Vehicles pass under gantries at normal speed and the toll is collected without stopping at a booth. NHAI says the aim is to end queues and waiting time, cut fuel burnt at toll plazas, and make highway trips safer and smoother.

What the guidelines standardise

  • Layout of the toll plaza and configuration of lanes.
  • The number of tolling lanes.
  • Where gantries are provided and how they are placed.
  • Road infrastructure, lighting and signage.
  • Road safety features and supporting facilities.

Separate layouts are laid down for different National Highway configurations, so the same principles can be applied across the country. Because vehicles no longer stop at physical barriers, an MLFF plaza needs fewer lanes than a conventional toll plaza. That frees space and keeps traffic moving through the tolling zone.

Which projects are covered

The rules apply to all future projects and to those under construction:

  • Projects at the Detailed Project Report (DPR) stage will build the new design into their DPR documents.
  • Projects already awarded or under construction will adopt the changes through the provisions of their contracts.
  • NHAI field offices must include the requirements in upcoming projects and help ongoing projects take them up.

Safety and user information

The circular stresses good lighting at plazas and advance guidance for drivers through signboards and Electronic Variable Message Signs (VMS), so that road users know they are entering a tolling zone. Each plaza is also to have an administrative building-cum-operations and maintenance centre to run the facility efficiently.

NHAI had earlier issued comprehensive guidelines for planning and designing High-Speed Access-Controlled National Highways other than Expressways. Those rules aim at uniform standards for DPRs of new high-speed corridors and better road safety. The MLFF circular extends the same push for uniform technical standards to toll collection.

Important Facts

Issued byNational Highways Authority of India (NHAI), Ministry of Road Transport and Highways
Date6 November 2026
SystemMulti-Lane Free Flow (MLFF), barrier-less toll collection
Highways coveredNational Highways of four lanes and above
Projects coveredAll future and under-construction National Highway projects
DPR-stage projectsNew design to be built into Detailed Project Report documents
Awarded projectsChanges adopted through applicable contract provisions
User informationSignage and Electronic Variable Message Signs (VMS)

Exam Point of View

Remember the issuing body (NHAI, under the Ministry of Road Transport and Highways), the full form of MLFF (Multi-Lane Free Flow), the highways covered (four lanes and above), that it is barrier-less tolling through gantries, how DPR-stage and awarded projects adopt it, and the use of Electronic Variable Message Signs (VMS).

Practice Questions

Q2.NationalMedium

NHAI's November 2026 guidelines standardising Multi-Lane Free Flow toll plaza design apply to National Highways with how many lanes?

  1. A.Two lanes and above
  2. B.Four lanes and above
  3. C.Six lanes and above
  4. D.Only Expressways
Show answer
Correct answer: B. Four lanes and above

NHAI's policy circular standardises the design and infrastructure of toll plazas on four-lane and wider National Highways so that upcoming and ongoing projects are ready for barrier-less MLFF toll collection.

Q3.NationalMedium

Under NHAI's MLFF guidelines, how will National Highway projects that are already awarded or under construction adopt the new toll plaza design?

  1. A.By preparing a fresh Detailed Project Report
  2. B.Through applicable contractual provisions
  3. C.By closing the existing toll plaza first
  4. D.They are exempt from the new design
Show answer
Correct answer: B. Through applicable contractual provisions

The guidelines apply to all future and under-construction National Highway projects, but in two different ways.

Frequently Asked Questions

What is Multi-Lane Free Flow (MLFF) tolling?

A barrier-less toll system in which vehicles are tolled while passing under gantries, without stopping at a toll booth. NHAI's new guidelines standardise plazas built for it.

On which highways do NHAI's MLFF design guidelines apply?

On National Highways of four lanes and above, for all future projects and those under construction.

Sources