Which work was sanctioned at a cost of ₹233 crore?
- A.Kavach 4.0 in Moradabad Division
- B.Electronic Interlocking at 21 stations of Samastipur Division
- C.The Adra-Joychandipahar bypass line
- D.Bhavnagar Para yard remodelling
Correct answer
Explanation
The correct answer is Electronic Interlocking at 21 stations of the Samastipur Division of East Central Railway, approved at a total cost of ₹233 crore. The work replaces existing panel interlocking with Electronic Interlocking, which is computer-based signalling in place of ageing relay-based systems, giving higher reliability, quicker fault diagnosis, easier maintenance and greater operational flexibility, besides supporting the roll-out of Kavach. The remaining options carry the other three figures of the same day and should be learnt as a set. Kavach 4.0 for the remaining 712 route kilometres of Moradabad Division cost ₹170 crore. The 11 km Adra-Joychandipahar bypass in South Eastern Railway cost ₹272 crore. The Bhavnagar Para yard remodelling in Gujarat cost about ₹125 crore. Arrange them in ascending order once and the four are easy to hold together.
Read the full article: Indian Railways Approves Kavach 4.0 and Three More Works
Practice Questions
Kavach Version 4.0 has been sanctioned for the remaining sections of which railway division?
- A.Samastipur Division
- B.Moradabad Division
- C.Adra Division
- D.Bhavnagar Division
Show answer
Indian Railways approved Kavach Version 4.0 on the sections of this division that were still without the system, covering 712 route kilometres at a total cost of ₹170 crore.
Read the full explanation →Kavach is best described as which kind of system?
- A.An indigenous Automatic Train Protection system
- B.A ticketing and reservation platform
- C.A satellite-based cargo tracking service
- D.A rolling stock maintenance depot
Show answer
The release sets out four things it does, and each of them is worth remembering separately because questions are framed on them.
Read the full explanation →The new bypass line between Adra and Joychandipahar is part of which corridor?
- A.Dedicated Freight Corridor
- B.Energy, Mineral and Cement Corridor
- C.Golden Quadrilateral
- D.Amrit Bharat Corridor
Show answer
The bypass of 11 km, sanctioned at ₹272 crore in South Eastern Railway, will separate train paths and provide a two-way connection to a third line that is planned on the route.
Read the full explanation →EPFO, which conducted Special Campaign 6, functions under which Union ministry?
- A.Ministry of Finance
- B.Ministry of Labour and Employment
- C.Ministry of Personnel, Public Grievances and Pensions
- D.Ministry of Social Justice and Empowerment
Show answer
The correct answer is Ministry of Labour and Employment, which issued the announcement on the conclusion of Special Campaign 6 by EPFO.
Read the full explanation →How many public grievances did EPFO dispose of during Special Campaign 6?
- A.2,05,000
- B.1,80,000
- C.2,36,021
- D.2,02,984
Show answer
That is the total number of public grievances EPFO disposed of during the campaign, against a target of 2,05,000, a performance 15.1 per cent above the mark.
Read the full explanation →