Skip to content
GK24
Science & TechnologyMedium

How many route kilometres of the Malkajgiri-Kamareddi section were upgraded from KAVACH Version 3.2 to Version 4.0?

  1. A.108 route kilometres
  2. B.208 route kilometres
  3. C.1,465 route kilometres
  4. D.512 route kilometres

Correct answer

A. 108 route kilometres

Explanation

The correct answer is 108 route kilometres. That is the length of the Malkajgiri-Kamareddi section in the Hyderabad Division on which the system was carried up from the older edition to the newer one. The figure of 208 is wrong; no such length is mentioned anywhere in the announcement and it is offered only as a near-miss distractor. The figure of 1,465 is the trap in this question: that is the spread of the earlier Version 3.2 across South Central Railway as a whole, not the stretch newly upgraded, and aspirants who read hurriedly often swap the two. The figure of 512 is wrong as well, since it appears nowhere in the release. The safest way to hold this pair in memory is to remember that the newly upgraded piece is small and the older version's footprint on the zone is more than ten times larger.

Read the full article: KAVACH 4.0 Goes Live First Time on South Central Railway

Q5.Science & TechnologyEasy

What does the acronym I-STEM, whose portal was integrated with the Startup India Portal in November 2026, stand for?

  1. A.Indian Scheme for Technology and Engineering Mentorship
  2. B.Indian Science, Technology and Engineering Facilities Map
  3. C.Integrated Startup Technology Enablement Mission
  4. D.Indian Society for Technology, Engineering and Mathematics
Show answer
Correct answer: B. Indian Science, Technology and Engineering Facilities Map

I-STEM is the portal that maps scientific equipment and research facilities across academic and research institutions so that they can be shared.