How many rakes had WCL loaded up to 31 October 2026, against the corresponding period a year earlier?

  1. A.4,402 against 3,146
  2. B.5,146 against 4,402
  3. C.6,146 against 4,402
  4. D.6,146 against 5,402

Correct answer

C. 6,146 against 4,402

Explanation

The correct answer is 6,146 rakes against 4,402, an increase of 39.6%. Enhanced coordination with the Railways and focused monitoring of rake placement and loading drove the improvement, and rake loading to the power sector alone grew by 40.8%. Option A is wrong because 4,402 is the figure for the previous year rather than the current one. Option B is wrong because the current year's loading was higher than the number given there. Option D is wrong because it misstates the base year figure. The gain in evacuation allowed the company to cut pithead coal stock from 13.034 MT on 1 April 2026 to 4.44 MT by the end of October, liquidating roughly two-thirds of the opening stock, while the extra rakes to MAHAGENCO supported about 5,800 million units of additional generation in Maharashtra.

Read the full article: WCL Beats All Three Coal Targets in April-October 2026

Q1.EconomyEasy

Western Coalfields Limited, in the news for exceeding all three of its key operational targets, is a subsidiary of which company?

  1. A.NTPC Limited
  2. B.Coal India Limited
  3. C.Singareni Collieries Company Limited
  4. D.NLC India Limited
Show answer
Correct answer: B. Coal India Limited

Western Coalfields Limited is a subsidiary of Coal India under the Ministry of Coal, and it was the only subsidiary to exceed its targets on coal production, offtake and overburden removal during April to October 2026, achieving 102.47%, 108.82% and 104.56% of those targets respectively.