Skip to content
GK24

Cabinet Clears 8.449 Km Aqua Line Metro Extension in Noida

The Union Cabinet approved an 8.449 km Aqua Line extension with 5 stations from Noida Sector-51 to Greater Noida Sector-04, lifting the network to 71.878 km.

By Published · 2 min read
Cabinet Clears 8.449 Km Aqua Line Metro Extension in Noida

Why in News

On 11 November 2026 the Union Cabinet approved the 8.449 km extension of the Aqua Line metro corridor from Noida Sector-51 to Greater Noida Sector-04 with 5 elevated stations, taking the local metro network to 71.878 km.

The Union Cabinet, chaired by Prime Minister Narendra Modi, has approved the extension of the Aqua Line metro rail corridor of the Noida Metro Rail Project. The new stretch will run from Noida Sector-51 to Greater Noida Sector-04, measure 8.449 km and carry 5 elevated stations. The Ministry of Housing and Urban Affairs handles the project.

What changes on the map

Once the corridor starts carrying passengers, the twin cities of Noida and Greater Noida will together hold an active metro network of 71.878 km. The line will also give riders a direct link to a high-demand corridor through an interchange with the Blue Line at Noida Sector-61, which is the join the two cities have lacked so far.

What the corridor will connect

  • Commercial hubs: Gaur City Mall, the Blue Sapphire Mall and commercial space at Greater Noida Sector-04, IKEA at Noida Sector-51 and the Anthurium mall at Noida Sector-73.
  • Offices and IT: Tech Mahindra and TCL Tech offices at Noida Sector-60, the Oil Industry Development Board at Noida Sector-73 and the Golden I office complex at Greater Noida Sector-04.
  • Hospitals: Kailash Hospital, Rama Hospital at Noida Sector-70, Cloud9 Hospital at Noida Sector-51 and Rama Hospital at Noida Sector-62.
  • Schools and homes: Delhi Public School at Noida Sector-122, Cleo County Residencies at the same sector and Gaur City 1 and 2 at Greater Noida Sector-04.

What the government expects

Four gains are listed. Road congestion should ease, because a rider who takes the metro is a vehicle taken off the road, and lighter traffic means shorter travel time and safer roads. Carbon emissions should fall, since a metro moves far more people per unit of energy than vehicles running on fossil fuel. Economic activity should pick up around the new stations, and access to Delhi's airport, its railway stations and bus depots should improve, which the government links to higher productivity. Socially, the extension spreads public transport across income groups and narrows the gap between those who can afford a private vehicle and those who cannot.

For the exam

Note that the Aqua Line belongs to the Noida Metro Rail Project, while the Blue Line that it meets at Sector-61 is part of the Delhi Metro network. The phrase worth remembering is the pair of figures: a route length of 8.449 km with 5 stations, feeding into a combined network of 71.878 km.

Important Facts

DecisionExtension of the Aqua Line metro rail corridor, Noida Metro Rail Project
Approved byUnion Cabinet chaired by Prime Minister Narendra Modi
RouteNoida Sector-51 to Greater Noida Sector-04
Route length8.449 km
Stations5 elevated stations
Network after commissioning71.878 km of active metro in Noida and Greater Noida
InterchangeBlue Line at Noida Sector-61
MinistryMinistry of Housing and Urban Affairs

Exam Point of View

Memorise the route length (8.449 km), the number of stations (5, all elevated), the terminals (Noida Sector-51 and Greater Noida Sector-04), the resulting network length (71.878 km), the interchange point (Blue Line at Noida Sector-61), the parent project (Noida Metro Rail Project) and the ministry (Housing and Urban Affairs).

Practice Questions

Frequently Asked Questions

How long is the approved Aqua Line extension and how many stations will it have?

The corridor is 8.449 km long and will have 5 elevated stations. It runs from Noida Sector-51 to Greater Noida Sector-04 under the Noida Metro Rail Project.

What will the metro network of Noida and Greater Noida measure once this corridor opens?

71.878 km. The Union Cabinet approved the extension on 11 November 2026, and the two cities will hold that much active metro rail network when the new stretch begins operations.

Where will the new corridor meet another metro line?

At Noida Sector-61, where riders can interchange with the Blue Line. The release describes this as a direct link to a high-demand corridor that the two cities have so far lacked.

Sources