At which station will the extended Aqua Line corridor provide an interchange with the Blue Line?
- A.Noida Sector-51
- B.Noida Sector-61
- C.Noida Sector-73
- D.Greater Noida Sector-04
Correct answer
Explanation
The correct answer is Noida Sector-61. The decision notes that the extension gives riders direct access to a high-demand corridor, and the point of transfer is the Blue Line interchange at this station. Option A, Noida Sector-51, is one terminal of the new corridor, not the interchange, though the IKEA store there is among the destinations the line will serve. Option C, Noida Sector-73, is a stop on the alignment near the Anthurium mall and the Oil Industry Development Board, but no interchange is mentioned there. Option D, Greater Noida Sector-04, is the other terminal and serves Gaur City Mall, the Blue Sapphire Mall and the Golden I complex. The corridor measures 8.449 km with 5 elevated stations and will lift the local network to 71.878 km.
Read the full article: Cabinet Clears 8.449 Km Aqua Line Metro Extension in Noida
Practice Questions
What is the route length of the Aqua Line metro extension approved by the Union Cabinet?
- A.6.349 km
- B.8.449 km
- C.11.878 km
- D.14.449 km
Show answer
The Cabinet cleared an extension of this length on the Aqua Line of the Noida Metro Rail Project, running from Noida Sector-51 to Greater Noida Sector-04 and carrying 5 elevated stations.
Read the full explanation →After the new corridor is commissioned, what will be the length of the active metro network in Noida and Greater Noida?
- A.58.429 km
- B.63.878 km
- C.71.878 km
- D.80.327 km
Show answer
The decision states that the two cities will together hold that much active metro rail network once the extension starts carrying passengers.
Read the full explanation →What is the theme of the first gallery of the Yuge Yugeen Bharat Museum, expected to open in the later part of 2027?
- A.Languages and Scripts
- B.Mathematics and Astronomy
- C.Adornment
- D.Faith and Spirituality
Show answer
The inaugural gallery on this theme is expected to open to the public in the North Block in the later part of 2027, after which galleries will be added in a modular way.
Read the full explanation →The Yuge Yugeen Bharat Museum will be developed at which location in New Delhi?
- A.Rashtrapati Bhavan complex
- B.North and South Block complex
- C.Red Fort complex
- D.Pragati Maidan complex
Show answer
The museum is being created through adaptive reuse of these historic buildings after government offices move out of them, so that their architectural and heritage character survives while they take on a new role as a public cultural institution.
Read the full explanation →What is the estimated project cost of the Yuge Yugeen Bharat Museum approved by the CCEA?
- A.Rs 1,780 crore
- B.Rs 2,230 crore
- C.Rs 3,230 crore
- D.Rs 5,230 crore
Show answer
The Cabinet Committee on Economic Affairs cleared the museum at this estimated cost, a figure appraised by the Public Investment Board, and the Ministry of Culture concurred with its recommendations.
Read the full explanation →