Which organisation is executing the Mumbai to Ahmedabad High Speed Rail project?
- A.Dedicated Freight Corridor Corporation of India
- B.National High Speed Rail Corporation Limited
- C.Rail Vikas Nigam Limited
- D.Indian Railway Construction International Limited
Correct answer
Explanation
The correct answer is B, the National High Speed Rail Corporation Limited, a company set up specifically to build and later operate high-speed rail in India, with the Union Government and the Governments of Gujarat and Maharashtra as shareholders. Option A, the Dedicated Freight Corridor Corporation of India, was created for a different purpose, namely the Eastern and Western freight corridors that take goods traffic off passenger routes. Option C, Rail Vikas Nigam Limited, executes conventional railway projects such as doubling, electrification and new lines. Option D, formerly known as IRCON International, is a construction company of the Railways that builds projects in India and abroad and has worked on difficult Himalayan alignments. All four belong to the railway family, and the question tests which of them owns the bullet train project.
Read the full article: Railway Technology: Kavach, Vande Bharat, High-Speed Rail
Practice Questions
View allKavach, developed by Indian Railways, is:
- A.An Automatic Train Protection system
- B.An online ticket booking platform
- C.A new railway track gauge
- D.A mobile application for tracking freight
Show answer
Kavach is an electronic safety system that acts on a moving train when its driver does not: it applies the brakes if a signal at danger is being approached without braking, holds a train back from passing a red signal, and keeps two locomotives fitted with the system from closing…
Read the full explanation →Which organisation of Indian Railways developed the Kavach system?
- A.Research Designs and Standards Organisation
- B.Centre for Railway Information Systems
- C.Indian Railway Catering and Tourism Corporation
- D.Dedicated Freight Corridor Corporation of India
Show answer
It is the research, design and standards wing of Indian Railways, has its headquarters at Lucknow, and developed Kavach in partnership with Indian manufacturers, first under the name Train Collision Avoidance System.
Read the full explanation →Kavach has been certified at which Safety Integrity Level?
- A.SIL-1
- B.SIL-2
- C.SIL-3
- D.SIL-4
Show answer
Safety Integrity Level is a scale of four grades used for safety related electronic systems, and level four is the most demanding, meaning the probability of a dangerous undetected failure is designed to be the lowest of all.
Read the full explanation →Which of the following accidents can Kavach NOT prevent?
- A.A train passing a signal at danger
- B.A head-on collision between two locomotives fitted with the system
- C.A derailment caused by a fractured rail
- D.Overspeeding on a curve with a speed restriction
Show answer
Kavach works on the movement of trains: it reads the position and speed of a locomotive from trackside tags, compares that with the signal and the permitted speed, and brakes the train when the driver does not.
Read the full explanation →Vande Bharat Express train sets are designed and manufactured at:
- A.Rail Coach Factory, Kapurthala
- B.Integral Coach Factory, Chennai
- C.Chittaranjan Locomotive Works
- D.Modern Coach Factory, Raebareli
Show answer
The correct answer is B, the Integral Coach Factory at Chennai, which designed the train set under the project name Train 18 and rolled out the first rake.
Read the full explanation →