Kavach has been certified at which Safety Integrity Level?
- A.SIL-1
- B.SIL-2
- C.SIL-3
- D.SIL-4
Correct answer
Explanation
The correct answer is D, SIL-4. Safety Integrity Level is a scale of four grades used for safety related electronic systems, and level four is the most demanding, meaning the probability of a dangerous undetected failure is designed to be the lowest of all. Signalling and train protection systems on main line railways are built to this level because a single failure can cost many lives, and Kavach was certified accordingly before being adopted as the national Automatic Train Protection standard. Options A, B and C, the lower levels, are used for systems whose failure carries a smaller consequence, such as some industrial process controls and auxiliary equipment; accepting a lower level for train protection would defeat its purpose. A candidate who remembers only the phrase highest level will still get this question right, because SIL-4 is the highest of the four.
Read the full article: Railway Technology: Kavach, Vande Bharat, High-Speed Rail
Practice Questions
View allKavach, developed by Indian Railways, is:
- A.An Automatic Train Protection system
- B.An online ticket booking platform
- C.A new railway track gauge
- D.A mobile application for tracking freight
Show answer
Kavach is an electronic safety system that acts on a moving train when its driver does not: it applies the brakes if a signal at danger is being approached without braking, holds a train back from passing a red signal, and keeps two locomotives fitted with the system from closing…
Read the full explanation →Which organisation of Indian Railways developed the Kavach system?
- A.Research Designs and Standards Organisation
- B.Centre for Railway Information Systems
- C.Indian Railway Catering and Tourism Corporation
- D.Dedicated Freight Corridor Corporation of India
Show answer
It is the research, design and standards wing of Indian Railways, has its headquarters at Lucknow, and developed Kavach in partnership with Indian manufacturers, first under the name Train Collision Avoidance System.
Read the full explanation →Which of the following accidents can Kavach NOT prevent?
- A.A train passing a signal at danger
- B.A head-on collision between two locomotives fitted with the system
- C.A derailment caused by a fractured rail
- D.Overspeeding on a curve with a speed restriction
Show answer
Kavach works on the movement of trains: it reads the position and speed of a locomotive from trackside tags, compares that with the signal and the permitted speed, and brakes the train when the driver does not.
Read the full explanation →Vande Bharat Express train sets are designed and manufactured at:
- A.Rail Coach Factory, Kapurthala
- B.Integral Coach Factory, Chennai
- C.Chittaranjan Locomotive Works
- D.Modern Coach Factory, Raebareli
Show answer
The correct answer is B, the Integral Coach Factory at Chennai, which designed the train set under the project name Train 18 and rolled out the first rake.
Read the full explanation →The first Vande Bharat Express was flagged off in which year?
- A.2016
- B.2019
- C.2021
- D.2023
Show answer
The first Vande Bharat Express was flagged off on 15 February 2019, after the train set had been built at the Integral Coach Factory under the name Train 18 and tested on Indian track.
Read the full explanation →