Which milestone did the Koraput Division of HAL mark on 6 October 2026?
- A.Delivery of its 1,000th aero-engine
- B.Delivery of its 2,000th aero-engine
- C.Overhaul of its 5,000th aero-engine
- D.Export of its 500th aero-engine
Correct answer
Explanation
The correct answer is delivery of its 2,000th aero-engine. The Defence Minister was present at Koraput for this handover, which came six decades after the Division was set up in 1964. Option A understates the figure; the thousandth engine is not the milestone being marked here. Option C mixes up two different counts: Koraput has indeed overhauled engines in large numbers, more than 9,000 of them, but the event of the day was a delivery and not an overhaul landmark. Option D is wrong because the announcement concerned supply to India's own Defence Forces rather than exports. Candidates should remember the pairing of two numbers for this unit: 2,000 engines delivered and over 9,000 engines overhauled. The Division's output has powered frontline fighters such as the MiG-21, MiG-27, MiG-29 and the Su-30MKI, and the Minister described the two thousand engines as two thousand contributions to the operational capability of the armed forces.
Read the full article: HAL Koraput Delivers Its 2,000th Aero-Engine to Forces
Practice Questions
What is the investment announced for the second Shakti engine production line?
- A.Rs 135 crore
- B.Rs 218 crore
- C.Rs 335 crore
- D.Rs 661 crore
Show answer
The second Shakti engine line carries this outlay and will be able to produce up to 100 engines a year once it is fully established by 2028-29, feeding indigenous helicopters such as the Dhruv Advanced Light Helicopter and the Prachand Light Combat Helicopter.
Read the full explanation →For which aircraft programme is an indigenous high-thrust engine being pursued with an investment of about Rs 5,000 crore?
- A.Tejas Mk1A
- B.Advanced Medium Combat Aircraft (AMCA)
- C.Prachand Light Combat Helicopter
- D.Su-30MKI upgrade
Show answer
The Defence Minister said aerospace self-reliance must extend to an indigenous aero-engine capability, especially for the AMCA, and pointed to a proposed investment of around Rs 5,000 crore, indigenisation of raw materials together with Mishra Dhatu Nigam Limited and the setting up of India's first home-built high-thrust engine testing facility.
Read the full explanation →In which state is the HAL Division that delivered the 2,000th aero-engine located?
- A.Odisha
- B.Karnataka
- C.Uttar Pradesh
- D.Telangana
Show answer
HAL's Koraput Division sits in that state, and Odisha Chief Minister Mohan Charan Majhi attended the delivery event.
Read the full explanation →Which laboratory carried out the hydrodynamic analysis and model testing of DSC A21 at the design stage?
- A.Naval Physical and Oceanographic Laboratory, Kochi
- B.Naval Science and Technological Laboratory, Visakhapatnam
- C.Aeronautical Development Establishment, Bengaluru
- D.Defence Metallurgical Research Laboratory, Hyderabad
Show answer
While DSC A21 was still on the drawing board, this laboratory carried out the hydrodynamic analysis and model testing that confirmed the twin-hull design would deliver the stability and sea-keeping expected of it.
Read the full explanation →What hull form does the newly delivered DSC A21 have?
- A.Single-hull displacement form
- B.Trimaran
- C.Catamaran
- D.Hydrofoil
Show answer
DSC A21 is built on a catamaran, or twin-hull, form, and this is the design feature the Navy highlighted. The form gives the craft greater stability, a larger deck area and better sea-keeping characteristics, which together make it suited to its specialist work of supporting divers.
Read the full explanation →