Which bridge reduced the rail journey between Nirmali and Saraigarh from about eight hours to 30 minutes?
- A.Bogibeel Bridge
- B.Bhupen Hazarika Setu
- C.Kosi Rail Mahasetu
- D.Sisseri River Bridge
Correct answer
Explanation
The correct answer is the Kosi Rail Mahasetu in Bihar, opened in September 2020. Besides cutting the running time from roughly eight hours to half an hour, it shortened the distance between the two points from about 300 km to 22 km, which is why it is quoted as one of the sharpest connectivity gains in the document. Option A, the Bogibeel Bridge of December 2018, is a rail-cum-road bridge over the Brahmaputra that reduced a day-long journey between Dhemaji and Dibrugarh to about one to two hours. Option B, the Bhupen Hazarika Setu or Dhola–Sadiya bridge of May 2017, brought the Rupai to Meka and Roing trip down from six hours to one hour. Option D, the 200-metre Sisseri River Bridge of November 2019, saves about five hours between Pasighat and Roing. Each of these four bridges is tied to a different state and a different saving, so they should be learnt as a table.
Read the full article: Infrastructure Push Cuts Travel Time, 549 Trains Speeded Up
Practice Questions
According to the PIB backgrounder, how many trains were speeded up in the 2026 railway timetable?
- A.376
- B.459
- C.549
- D.649
Show answer
The backgrounder states that the 2026 railway timetable speeded up 549 trains across the network, and it breaks that total into four bands.
Read the full explanation →What are the length and operating speed of the Mumbai–Ahmedabad high-speed rail corridor?
- A.408 km and 300 kmph
- B.508 km and 320 kmph
- C.608 km and 350 kmph
- D.508 km and 250 kmph
Show answer
The corridor will serve 12 stations and includes India’s first undersea rail tunnel, which runs about 7 km beneath Thane Creek, and the first service on it is targeted for August 2027.
Read the full explanation →The seven high-speed rail corridors announced in the Union Budget 2026–27 cover a total length of about
- A.2,000 km
- B.3,000 km
- C.4,000 km
- D.6,000 km
Show answer
The backgrounder says the seven announced high-speed rail corridors span nearly 4,000 km with an estimated investment of 16 lakh crore rupees, and that they are meant to bring major city pairs within roughly one to four hours of each other.
Read the full explanation →Which of these intellectual property areas was highlighted for Indian Knowledge Systems in the new agreement?
- A.Patents, copyrights and geographical indications
- B.Trade secrets and franchise rights
- C.Spectrum licensing
- D.Carbon credits
Show answer
Prof. Ganti S. Murthy stressed the need for stronger guidance on these intellectual property aspects of Indian Knowledge Systems and traditional knowledge, along with better attribution frameworks to safeguard the rights of knowledge holders and suitable legal instruments for protection.
Read the full explanation →How many workshops on traditional knowledge, intellectual property rights and people’s rights were held under the earlier collaboration?
- A.7
- B.9
- C.11
- D.15
Show answer
Under the earlier Memorandum of Understanding, signed on 29 June 2023 in the presence of Dr Jitendra Singh and Dr N. Kalaiselvi, the IKS Division and the CSIR-TKDL Unit jointly conducted that many workshops.
Read the full explanation →