According to the PIB backgrounder, how many trains were speeded up in the 2026 railway timetable?
- A.376
- B.459
- C.549
- D.649
Correct answer
Explanation
The correct answer is 549. The backgrounder states that the 2026 railway timetable speeded up 549 trains across the network, and it breaks that total into four bands. Twenty trains became faster by an hour or more, another 48 gained between 31 and 59 minutes, 105 gained between 16 and 30 minutes, and the remaining 376 were speeded up by 5 to 15 minutes. Option A, 376, is the figure for the last and largest band alone, which makes it the most tempting wrong answer, so candidates must read whether a question asks for the total or for one band. Option B, 459, and option D, 649, do not appear anywhere in the document. The safest way to carry this set into the examination hall is to remember the total first and then the four bands in descending order of time saved, because questions are set on both.
Read the full article: Infrastructure Push Cuts Travel Time, 549 Trains Speeded Up
Practice Questions
What are the length and operating speed of the Mumbai–Ahmedabad high-speed rail corridor?
- A.408 km and 300 kmph
- B.508 km and 320 kmph
- C.608 km and 350 kmph
- D.508 km and 250 kmph
Show answer
The corridor will serve 12 stations and includes India’s first undersea rail tunnel, which runs about 7 km beneath Thane Creek, and the first service on it is targeted for August 2027.
Read the full explanation →Which bridge reduced the rail journey between Nirmali and Saraigarh from about eight hours to 30 minutes?
- A.Bogibeel Bridge
- B.Bhupen Hazarika Setu
- C.Kosi Rail Mahasetu
- D.Sisseri River Bridge
Show answer
Besides cutting the running time from roughly eight hours to half an hour, it shortened the distance between the two points from about 300 km to 22 km, which is why it is quoted as one of the sharpest connectivity gains in the document.
Read the full explanation →The seven high-speed rail corridors announced in the Union Budget 2026–27 cover a total length of about
- A.2,000 km
- B.3,000 km
- C.4,000 km
- D.6,000 km
Show answer
The backgrounder says the seven announced high-speed rail corridors span nearly 4,000 km with an estimated investment of 16 lakh crore rupees, and that they are meant to bring major city pairs within roughly one to four hours of each other.
Read the full explanation →Which of these was cited by the minister as a material developed from rice straw for road construction?
- A.Steel slag
- B.Bio-bitumen
- C.Fly ash
- D.Geopolymer cement
Show answer
The minister referred to bio-bitumen developed from rice straw while making the case for alternative materials in highway construction, presenting it as an example of research moving into field application and reducing dependence on conventional resources.
Read the full explanation →Which organisation holds the Annual Session that Nitin Gadkari addressed and frames technical codes and guidelines for road development in India?
- A.National Highways Authority of India
- B.Indian Roads Congress
- C.Central Road Research Institute
- D.Bureau of Indian Standards
Show answer
The minister noted that this body has produced the technical codes, guidelines, manuals and publications that guide road infrastructure development in the country, and he urged it to strengthen international cooperation so that Indian standards keep pace with global practice.
Read the full explanation →