What was India’s installed solar power capacity as of 31 October 2026, according to the PIB backgrounder of 17 November 2026?
- A.About 133 GW
- B.About 175 GW
- C.About 192 GW
- D.About 308 GW
Correct answer
Explanation
The correct answer is about 175 GW. Solar capacity stood at 2.82 GW in 2014 and reached roughly 175 GW by 31 October 2026, an expansion of about 62 times, which makes solar the largest single component of the country’s renewable fleet.
Option A, 133 GW, is the figure for large projects alone, counting the solar component of hybrid plants; rooftop systems tied to the grid add 34.97 GW and off-grid installations make up the rest, so 133 GW is only a part of the total. Option C, 192 GW, is not a generation figure at all: it is the solar module manufacturing capacity reached by June 2026, up from 2.3 GW in 2014. Option D, 308 GW, is close to the total non-fossil fuel capacity of 308.03 GW recorded on 30 September 2026, which takes in all renewables and 8.78 GW of nuclear power, not solar alone. Candidates should keep these four numbers apart, because question setters mix them freely.
Read the full article: India's Solar Capacity Touches 175 GW, 62-Fold Rise Since 2014
Practice Questions
Which entity discovered India’s record-low solar tariff of ₹1.99 per unit, and in which year?
- A.NTPC, in 2018
- B.Solar Energy Corporation of India, in 2019
- C.Gujarat Urja Vikas Nigam Ltd, in 2020
- D.NHPC, in 2021
Show answer
The record tariff of ₹1.99 a unit was reached in a competitive bid run by that state utility, down from around ₹18 a unit in 2010, and it is the lowest figure quoted for solar power in India.
Read the full explanation →The Pradhan Mantri Surya Sarovar Yojana, approved on 31 July 2026, supports how much floating solar capacity?
- A.2,000 MW
- B.5,000 MW
- C.10,000 MW
- D.20,000 MW
Show answer
The scheme was cleared on 31 July 2026 with an outlay of ₹5,070 crore to build floating solar photovoltaic projects of that size, each with a co-located energy storage system of at least two hours, so that states can meet evening peaks.
Read the full explanation →Which of the following continued to apply in the NCR even after GRAP Stage III was revoked?
- A.Complete ban on all construction in the NCR
- B.Curbs on dust-generating demolition and outdoor construction, barring exempted projects
- C.Closure of all schools in Delhi
- D.Ban on the entry of all trucks into Delhi
Show answer
These were imposed by an order of 30 October 2026 and were expressly kept in force when Stage III was withdrawn on 17 November 2026.
Read the full explanation →What was Delhi's Air Quality Index on the day Stage III of GRAP was withdrawn?
- A.104
- B.154
- C.204
- D.304
Show answer
The sub-committee recorded that Delhi's Air Quality Index stood at this level on 17 November 2026 and that the trend was one of improvement, which is why the Stage III curbs, meant for the 'Severe' tier of air quality, were lifted with immediate effect.
Read the full explanation →Which body took the decision to revoke Stage III of the Graded Response Action Plan in Delhi-NCR?
- A.Central Pollution Control Board
- B.Sub-committee on GRAP of the CAQM
- C.Delhi Pollution Control Committee
- D.National Green Tribunal
Show answer
It met to review the region's air quality, examined the weather conditions and forecasts given by the India Meteorological Department and the Indian Institute of Tropical Meteorology, and then set aside its own earlier order by which Stage III had been invoked.
Read the full explanation →