What plot area threshold continues to apply for web portal registration and monitoring of dust control at construction and demolition sites in the NCR?
- A.100 square metres
- B.250 square metres
- C.500 square metres
- D.1000 square metres
Correct answer
Explanation
The correct answer is 500 square metres. While approving the amendment that widens web portal based registration and monitoring of dust control measures to construction and demolition projects lying beyond municipal limits, in controlled areas, development and industrial development areas, industrial zones and highway corridor zones, the Commission specifically kept the existing plot area threshold of 500 square metres and the other existing requirements unchanged. Options A and B name smaller thresholds that would have brought in far more sites, and option D names a larger one that would have excluded many projects; none of these was adopted. The point to remember is that the geographical coverage was widened but the size trigger itself was left as it was.
Read the full article: CAQM Clears Revised GRAP Schedule With 48 Actions for NCR
Practice Questions
How many actions in total does the revised Graded Response Action Plan schedule approved by CAQM contain?
- A.36
- B.42
- C.48
- D.54
Show answer
The revised GRAP schedule cleared by the Commission for Air Quality Management carries 25 actions in Stage-I, 8 actions in Stage-II, 10 actions in Stage-III and 5 actions in Stage-IV, which adds up to 48 actions in all.
Read the full explanation →Which district has been newly brought under the restriction on plying BS-III petrol and BS-IV diesel or older light motor vehicles?
- A.Sonipat
- B.Panipat
- C.Meerut
- D.Alwar
Show answer
Under the revised schedule the bar on running BS-III petrol and BS-IV diesel or older four-wheelers has been extended to Sonipat, over and above the high vehicular density districts where it already applied, namely Gurugram, Faridabad, Ghaziabad and Gautam Budh Nagar.
Read the full explanation →In the revised GRAP schedule, restrictions on diesel generator sets and entry of BS-IV and older buses have been moved to which stage?
- A.Stage-I
- B.Stage-II
- C.Stage-III
- D.Stage-IV
Show answer
The Commission shifted the actions dealing with diesel generator sets and with the entry of buses of BS-IV standard and below coming from the National Capital Region and the adjoining states out of Stage-II and into Stage-I. Because GRAP stages are triggered in ascending order as air quality worsens, moving…
Read the full explanation →Where does India rank in the world in installed wind power capacity?
- A.Second
- B.Third
- C.Fourth
- D.Sixth
Show answer
Installed wind capacity in the country had reached 59.20 GW by 29 October 2026, and the sector added 6.05 GW during the financial year 2025-26, its highest annual addition so far.
Read the full explanation →What is the total outlay of PM-Surya Ghar: Muft Bijli Yojana?
- A.Rs 5,070 crore
- B.Rs 19,744 crore
- C.Rs 35,800 crore
- D.Rs 75,021 crore
Show answer
The rooftop solar scheme was launched in February 2024 with that outlay and a target of one crore households.