What is the theme of the first gallery of the Yuge Yugeen Bharat Museum, expected to open in the later part of 2027?
- A.Languages and Scripts
- B.Mathematics and Astronomy
- C.Adornment
- D.Faith and Spirituality
Correct answer
Explanation
The correct answer is Adornment. The inaugural gallery on this theme is expected to open to the public in the North Block in the later part of 2027, after which galleries will be added in a modular way. Options A, B and D name themes that are indeed planned for the museum, Languages and Scripts, Mathematics and Astronomy, and Faith and Spirituality, along with Architecture and Cityscapes and Bharat Connects: Trade and Ideas, but none of them is the first gallery to open. Candidates should also recall that around 18 lakh objects have been identified for display, drawn from the National Museum, other museums of the Ministry of Culture, 52 site museums of the Archaeological Survey of India and various state and private collections, and that the project cost is Rs 3,230 crore.
Read the full article: CCEA Clears Rs 3,230 Crore Yuge Yugeen Bharat Museum Project
Practice Questions
What is the estimated project cost of the Yuge Yugeen Bharat Museum approved by the CCEA?
- A.Rs 1,780 crore
- B.Rs 2,230 crore
- C.Rs 3,230 crore
- D.Rs 5,230 crore
Show answer
The Cabinet Committee on Economic Affairs cleared the museum at this estimated cost, a figure appraised by the Public Investment Board, and the Ministry of Culture concurred with its recommendations.
Read the full explanation →The Yuge Yugeen Bharat Museum will be developed at which location in New Delhi?
- A.Rashtrapati Bhavan complex
- B.North and South Block complex
- C.Red Fort complex
- D.Pragati Maidan complex
Show answer
The museum is being created through adaptive reuse of these historic buildings after government offices move out of them, so that their architectural and heritage character survives while they take on a new role as a public cultural institution.
Read the full explanation →At which station will the extended Aqua Line corridor provide an interchange with the Blue Line?
- A.Noida Sector-51
- B.Noida Sector-61
- C.Noida Sector-73
- D.Greater Noida Sector-04
Show answer
The decision notes that the extension gives riders direct access to a high-demand corridor, and the point of transfer is the Blue Line interchange at this station.
Read the full explanation →After the new corridor is commissioned, what will be the length of the active metro network in Noida and Greater Noida?
- A.58.429 km
- B.63.878 km
- C.71.878 km
- D.80.327 km
Show answer
The decision states that the two cities will together hold that much active metro rail network once the extension starts carrying passengers.
Read the full explanation →What is the route length of the Aqua Line metro extension approved by the Union Cabinet?
- A.6.349 km
- B.8.449 km
- C.11.878 km
- D.14.449 km
Show answer
The Cabinet cleared an extension of this length on the Aqua Line of the Noida Metro Rail Project, running from Noida Sector-51 to Greater Noida Sector-04 and carrying 5 elevated stations.
Read the full explanation →