What is the outlay announced for PMGSY-IV?
- A.Rs 62,500 crore
- B.Rs 70,125 crore
- C.Rs 25,000 crore
- D.Rs 80,000 crore
Correct answer
Explanation
The correct answer is Rs 70,125 crore. Under PMGSY-IV, with this outlay, about 62,500 km of all-weather roads are targeted so that 25,000 eligible unconnected habitations receive connectivity. Option A is wrong because 62,500 is the road length in kilometres under this phase, not the money allotted, and the two figures are easy to confuse in a hurry. Option C is wrong for the same reason: 25,000 is the number of habitations to be connected, not a rupee figure. Option D is wrong because no such round figure appears in the review of the scheme. These three numbers were put out together at the PMGSY Chintan Shivir held at Bharat Mandapam on 5 and 6 October 2026, and they should be memorised as a set, along with the roughly 8 lakh km of rural roads already built over 25 years.
Read the full article: PMGSY Chintan Shivir: PMGSY-IV Targets 62,500 km of Roads
Practice Questions
How many eligible unconnected habitations is PMGSY-IV meant to connect?
- A.12,500
- B.25,000
- C.62,500
- D.1,00,000
Show answer
The current phase of the Pradhan Mantri Gram Sadak Yojana is designed to provide connectivity to 25,000 eligible unconnected habitations, and to do so it targets roughly 62,500 km of all-weather roads with an outlay of Rs 70,125 crore.
Read the full explanation →Which Union Minister addressed the PMGSY Chintan Shivir and asked for greater use of GPS-based monitoring and artificial intelligence?
- A.Nitin Gadkari
- B.Shivraj Singh Chouhan
- C.Kamlesh Paswan
- D.Rohit Kansal
Show answer
He addressed the Chintan Shivir and pressed for wider use of digital technologies, GPS-based monitoring and artificial intelligence in field verification, monitoring and timely decision-making, while also seeking faster preparation of Detailed Project Reports, better construction quality and stronger accountability.
Read the full explanation →Which body will act as the training partner for the Nal Jal Mitra programme, handling coordination, assessment, certification and fund disbursement?
- A.CSTARI
- B.NCVET
- C.National Instructional Media Institute
- D.National Jal Jeevan Mission
Show answer
It will serve as training partner for coordination of training, assessment, certification and the release of funds.
Read the full explanation →What is the total duration of the Nal Jal Mitra short-term training course?
- A.120 hours
- B.145 hours
- C.165 hours
- D.180 hours
Show answer
The course is split into 120 hours of institutional training, covering both theory and practical work, and 45 hours of compulsory on-the-job training at functioning rural piped water supply schemes.
Read the full explanation →How many candidates are to be trained and certified as Nal Jal Mitras under the MoU signed for Jal Jeevan Mission 2.0?
- A.50,000
- B.75,000
- C.One lakh
- D.Two lakh
Show answer
The MoU between the Department of Drinking Water and Sanitation and the Directorate General of Training sets a target of training and certifying at least that many candidates during the extended period of the mission, at an estimated outlay of about Rs 111.93 crore borne entirely by DDWS from its…
Read the full explanation →