Skip to content
GK24
DefenceMedium

What is the main propulsion change planned for INS Betwa during her refit?

  1. A.Her steam-based propulsion system will be replaced by a diesel-engine-based system
  2. B.Her diesel engines will be replaced by nuclear propulsion
  3. C.Her gas turbines will be replaced by a steam-based system
  4. D.Her diesel engines will be replaced by gas turbines

Correct answer

A. Her steam-based propulsion system will be replaced by a diesel-engine-based system

Explanation

The correct answer is that her steam-based propulsion system will give way to a diesel-engine-based system. This is precisely why the contract is called a refit and re-powering rather than a plain refit: the type of machinery that drives the frigate is itself being changed. Along with the new propulsion arrangement, a modernised weapon suite will be fitted to improve her operational effectiveness. Option B is wrong because nuclear propulsion forms no part of this project. Option C reverses the direction of the change, since the ship is moving away from steam rather than towards it. Option D is incorrect because gas turbines are not what replaces her present plant under this contract. The work is also meant to build indigenous strength in complex propulsion transformation, with more than 50 MSMEs expected to take part in the project.

Read the full article: INS Betwa Refit Contract Worth Rs 498.58 Crore Goes to CSL

Q1.DefenceEasy

Which shipyard has been given the contract for the normal refit and re-powering of INS Betwa?

  1. A.Mazagon Dock Shipbuilders Limited
  2. B.Cochin Shipyard Limited
  3. C.Garden Reach Shipbuilders and Engineers
  4. D.Hindustan Shipyard Limited
Show answer
Correct answer: B. Cochin Shipyard Limited

The Ministry of Defence signed the contract for the normal refit and re-powering of the frigate INS Betwa with Cochin Shipyard Limited, and the value of that contract is Rs 498.58 crore, described by the Ministry as approximately Rs 500 crore.