Skip to content
GK24
NationalMedium

India's first riverine lighthouses are being set up on which river?

  1. A.Ganga, National Waterway-1
  2. B.Brahmaputra, National Waterway-2
  3. C.West Coast Canal, National Waterway-3
  4. D.Godavari, National Waterway-4

Correct answer

B. Brahmaputra, National Waterway-2

Explanation

The correct answer is the Brahmaputra, National Waterway-2. Four riverine lighthouses, the first of their kind on an inland waterway in India, are being built at Pandu, Bogibeel, Silghat and Biswanath Ghat under a ₹74 crore project announced in March 2026. Each will stand 20 metres above ground, with a geographical range of 14 nautical miles and a luminous range of 8 to 10 nautical miles, and will run on solar power. Option A is wrong: the Ganga system is National Waterway-1 and carries River Information Services, not the first lighthouses. Option C is wrong because National Waterway-3, the West Coast Canal in Kerala, uses 312 lighted buoys and 17 beacon lamp posts instead. Option D is wrong because the lighthouse project is tied to the Brahmaputra, which runs 891 km from Dhubri to Sadiya and is the longest navigable stretch in the country.

Read the full article: India Builds Safer Navigation on 111 National Waterways

Q3.NationalMedium

Under the new NHAI system, the designs of critical highway structures will be independently checked mainly by:

  1. A.Empanelled IITs and reputed government technical institutions
  2. B.The Comptroller and Auditor General
  3. C.The Bureau of Indian Standards alone
  4. D.State public works departments
Show answer
Correct answer: A. Empanelled IITs and reputed government technical institutions

Under the procedure, three such institutions or firms are proposed from the authority panel and one or more is selected according to the needs of the project; the selected body examines the design on its own and submits observations and recommendations, which the contractor must act on before the authority…

Q5.NationalEasy

From which date does the NHAI policy on independent checking of bridge designs take effect?

  1. A.1 November 2026
  2. B.1 December 2026
  3. C.1 January 2027
  4. D.1 April 2027
Show answer
Correct answer: B. 1 December 2026

From that date the requirement of independent verification applies to every new highway project awarded under the Engineering, Procurement and Construction model, the Hybrid Annuity Model and the Build-Operate-Transfer model, and also to projects in which design verification or proof checking had not yet begun.