How large is the inpatient department at the AIIA main campus in Sarita Vihar?

  1. A.100 beds
  2. B.150 beds
  3. C.200 beds
  4. D.500 beds

Correct answer

C. 200 beds

Explanation

The correct answer is 200 beds. The clinical infrastructure at the institute main campus in Sarita Vihar, New Delhi, has an outpatient department able to attend to about 3,000 patients a day and an inpatient wing of that bed strength for people who need admission. Options A and B, at a hundred and a hundred and fifty beds, are wrong because they understate the capacity described in the report. Option D is wrong in the other direction, overstating it; no such bed figure is attached to the campus. The two capacity numbers are commonly asked together, so the pair to memorise is roughly three thousand outpatients a day and two hundred inpatient beds, which between them handled the bulk of the patients the institute counted over the ten-year period covered by the report.

Read the full article: AIIA Report: 37.74 Lakh Patients Treated in a Decade

Q1.Reports & IndicesEasy

Under which ministry does the All India Institute of Ayurveda function as an autonomous institution?

  1. A.Ministry of Health and Family Welfare
  2. B.Ministry of Ayush
  3. C.Ministry of Science and Technology
  4. D.Ministry of Education
Show answer
Correct answer: B. Ministry of Ayush

The All India Institute of Ayurveda in New Delhi is an autonomous institution under that ministry, and its stated work is healthcare, education, research and innovation in Ayurveda along with building recognition for India traditional systems of medicine.

Q3.Reports & IndicesMedium

Renewable energy sources accounted for roughly what share of India's total installed power capacity in the dashboard update?

  1. A.About 32 per cent
  2. B.About 38 per cent
  3. C.About 42 per cent
  4. D.About 50 per cent
Show answer
Correct answer: C. About 42 per cent

The power section of the dashboard shows total installed capacity rising 12.1 per cent to 5,32,739.7 MW, while capacity from renewable energy sources grew much faster, by 29.5 per cent, to reach 2,23,273 MW.

Q4.Reports & IndicesEasy

The PAIMANA Performance Monitoring Dashboard is released by which ministry?

  1. A.Ministry of Road Transport and Highways
  2. B.Ministry of Statistics and Programme Implementation
  3. C.Ministry of Ports, Shipping and Waterways
  4. D.NITI Aayog
Show answer
Correct answer: B. Ministry of Statistics and Programme Implementation

PAIMANA, which expands to Project Assessment, Infrastructure Monitoring and Analytics for Nation-building, is that ministry's dashboard for tracking the performance of infrastructure sub-sectors through a standard set of indicators, and it is updated every quarter.

Q5.Reports & IndicesMedium

How many kilometres of national highway projects were awarded in April-September of FY 2026-27, according to the dashboard?

  1. A.1,236.3 km
  2. B.2,236.3 km
  3. C.3,326.2 km
  4. D.4,236.3 km
Show answer
Correct answer: B. 2,236.3 km

The road transport and highways section of the dashboard records that much length of national highway projects awarded in the first six months of the financial year, which is a growth of 62.9 per cent over the same period a year earlier.