How much pumped storage capacity was operational in India as of August 2026?
- A.4.95 GW
- B.7.43 GW
- C.15.87 GW
- D.26.69 GW
Show answer
The correct answer is 7.43 GW, spread over ten projects, each with an installed capacity above twenty-five megawatts.
Read the full explanation →