Where was INAS 312 commissioned on 18 November 1976?

  1. A.INS Hansa, Goa
  2. B.INS Rajali, Arakkonam
  3. C.INS Dega, Visakhapatnam
  4. D.INS Garuda, Kochi

Correct answer

A. INS Hansa, Goa

Explanation

The correct answer is INS Hansa, Goa. INAS 312 was raised there on 18 November 1976 with five Lockheed Super Constellation aircraft that the Indian Air Force handed over to the Navy, and the Navy took up the long-range maritime reconnaissance role after the 1971 war had exposed the limits of watching the sea with ships and helicopters alone. Option B, INS Rajali at Arakkonam, is the trap: it is where the Boeing P-8I was inducted in 2013 and where INAS 312 is based today, but it is not where the squadron was first commissioned. Options C and D name naval air stations that are not connected with this squadron's raising. The chain worth memorising runs INS Hansa in 1976 for the raising, INS Rajali in 2013 for the P-8I, and INS Hansa again as the home of INAS 316.

Read the full article: Indian Navy Marks 50 Years of Maritime Patrol Flying

Q3.DefenceMedium

Which of these operations did the Indian Navy's long-range maritime reconnaissance aircraft support?

  1. A.Only Operation Cactus
  2. B.Cactus, Vijay, Parakram and Sindoor
  3. C.Only Operation Vijay and Operation Polo
  4. D.Only Operation Sindoor
Show answer
Correct answer: B. Cactus, Vijay, Parakram and Sindoor

Over the five decades since the role began, the Navy's shore-based patrol aircraft flew in support of all four of these operations, besides anti-piracy patrols and search and rescue missions across the Indian Ocean.

Q5.DefenceMedium

Under which procurement route was the Barak Point Defence Missile System upgrade contract signed?

  1. A.Buy (Indian-IDDM)
  2. B.Other Capital Procurement Procedure
  3. C.Strategic Partnership Model
  4. D.Make-II procedure
Show answer
Correct answer: B. Other Capital Procurement Procedure

The Ministry of Defence stated that the contract for upgradation and obsolescence management of the Barak Point Defence Missile System was inked under this route, in the presence of Defence Secretary Shri Rajesh Kumar Singh, at an overall cost of Rs 1,976.40 crore.