What was the average daily coal supply to the power sector in October 2026, and how did it compare with the supply plan?
- A.2.21 MT a day, below the plan
- B.2.37 MT a day, equal to the plan
- C.2.49 MT a day, above the plan
- D.2.65 MT a day, above the plan
Correct answer
Explanation
The correct answer is 2.49 MT a day, above the plan. Coal actually delivered to the power sector averaged 2.49 MT a day in October 2026 while the plan for the month provided for 2.37 MT a day, so supply ran ahead of the programme and bettered it on nine of the first ten days. Option A is wrong because 2.21 MT a day was the September 2026 average, and the October figure is higher, not lower. Option B is wrong because 2.37 MT a day is the planned quantity itself, and actual supply exceeded it rather than merely matching it. Option D is wrong because 2.65 MT a day overstates the delivery; the reported average is 2.49 MT a day. The pairing of the actual figure with the plan figure is the part examiners test, since both numbers appear together in the ministry’s statement.
Read the full article: Coal Stocks at Power Plants Stay Above 18 MT in October 2026
Practice Questions
What was the coal stock at India’s domestic coal-based power plants on 10 October 2026?
- A.16.418 MT
- B.18.205 MT
- C.19.932 MT
- D.21.640 MT
Show answer
The Ministry of Coal placed the stock at domestic coal-based power plants at 18.205 MT on 10 October 2026, which is why the ministry could say that the level has not fallen below 18 MT at any time since 29 September 2026, when the reading was 18.932 MT.
Read the full explanation →How many rakes a day, on average, were loaded for the power sector between 1 and 10 October 2026?
- A.426 rakes
- B.447 rakes
- C.469 rakes
- D.482 rakes
Show answer
Loading for the power sector averaged 469 rakes a day over the first ten days of October 2026, and it is this heavier movement that lifted daily coal supply and slowed the drawdown of stock.
Read the full explanation →By roughly how much did coal stock at power plants decline through September 2026?
- A.0.56 MT
- B.3.14 MT
- C.7.28 MT
- D.12.90 MT
Show answer
Stock at power plants fell by about 7.28 MT over the whole of September 2026, which works out to an average draw of roughly 0.24 MT a day and explains why the easing seen in October was treated as a notable change.
Read the full explanation →What was the aggregate highest bid value from the two e-auctions NLMC conducted at Visakhapatnam for Rashtriya Ispat Nigam Limited?
- A.₹284.40 crore across 164 land parcels
- B.₹584.40 crore across 264 land parcels
- C.₹884.40 crore across 364 land parcels
- D.₹1,584 crore across 464 land parcels
Show answer
The two electronic auctions were held on behalf of Rashtriya Ispat Nigam Limited at Visakhapatnam on 12 October and 3 November 2026, and the corporation treated their outcome as a milestone because this was its first end-to-end electronic auction exercise, run from valuation through to the sale itself.
Read the full explanation →The fresh monetisation and valuation proposals taken up at the 22nd NLMC board meeting related to which two companies?
- A.BSNL and MTNL
- B.RINL and SAIL
- C.ONGC and GAIL
- D.BHEL and BEML
Show answer
The Board considered fresh asset monetisation and valuation proposals relating to Bharat Sanchar Nigam Limited and Mahanagar Telephone Nigam Limited, whose combined assessed value is about 1,300 crore rupees, for further processing in line with the prescribed government procedures.
Read the full explanation →