What is the outlay of the Mizoram Ginger Mission announced for the state’s ginger growers?
- A.Rs 89.79 crore
- B.Rs 189.79 crore
- C.Rs 289.79 crore
- D.Rs 389.79 crore
Correct answer
Explanation
The correct answer is Rs 189.79 crore. The Mizoram Ginger Mission of this size is meant to draw nearly 20,000 farming households into a single value chain that covers cultivation, processing, branding, connectivity and access to national and international markets. Mizo ginger was described as the unique strength and economic identity of the state, and the aim of the mission is not merely to raise production but to see that farmers and local communities keep a larger share of the value created, which is why the road built in the ginger pilot belt matters to it. Options A, C and D give sums that were not sanctioned for the mission. Candidates should also link the mission with the Daido-Vangkawt Road in Champhai, a 3.33-kilometre road built under NESIDS-Roads at Rs 17.24 crore to carry produce from that belt to the market.
Read the full article: Scindia Opens Rs 331 Crore Development Projects in Mizoram
Practice Questions
What was the total value of the development projects inaugurated and begun by the Union DoNER Minister in Mizoram in October 2026?
- A.Rs 102 crore
- B.Rs 228.54 crore
- C.Rs 331 crore
- D.Rs 512 crore
Show answer
Union Minister for Communications and DoNER, Jyotiraditya M. Scindia, took up ten projects of about this value in Mizoram on 12 October 2026 in the presence of Chief Minister Pu Lalduhoma.
Read the full explanation →The railway line that brought Mizoram onto India’s railway map connects Bairabi with which station, and how long is it?
- A.Sairang, 51.38 kilometres
- B.Silchar, 74 kilometres
- C.Sairang, 21 kilometres
- D.Zemabawk, 32.70 kilometres
Show answer
The Bairabi-Sairang railway line of that length was called a historic milestone that placed Mizoram on the railway map of the country and changed the state’s access to major economic centres.
Read the full explanation →Under which programme will specialised nurseries be developed in Madhya Pradesh to supply disease-free planting material?
- A.Per Drop More Crop
- B.Clean Plant Programme
- C.Scientific Agricultural Roadmap
- D.Mission for Integrated Horticulture
Show answer
Under it, work will be taken up to develop specialised nurseries in Madhya Pradesh so that farmers get planting material that is disease-free and of high quality.
Read the full explanation →Who held the high-level meeting with Madhya Pradesh Chief Minister Dr Mohan Yadav on agricultural and rural development proposals?
- A.Prahlad Singh Patel
- B.Aidal Singh Kansana
- C.Shivraj Singh Chouhan
- D.The Prime Minister
Show answer
The correct answer is Shivraj Singh Chouhan, who holds charge of Agriculture and Farmers’ Welfare as well as Rural Development, and who chaired the meeting that cleared Rs 643.14 crore for 223 bridges in Madhya Pradesh.
Read the full explanation →How much did the Centre approve for the construction of 223 bridges in Madhya Pradesh in November 2026?
- A.Rs 423.50 crore
- B.Rs 643.14 crore
- C.Rs 843.20 crore
- D.Rs 1,043.14 crore
Show answer
This is the amount the Centre cleared for building 223 bridges in Madhya Pradesh, a decision taken at the review meeting held on 25 November 2026 between the Union Minister for Agriculture and Farmers’ Welfare and Rural Development, Shivraj Singh Chouhan, and the Chief Minister of Madhya Pradesh, Dr Mohan…
Read the full explanation →