The upgraded Slipway-4 at Hindustan Shipyard Limited now allows the yard to build and launch ships of what maximum size?
- A.Up to 25,000 DWT
- B.Up to 35,000 DWT
- C.Up to 45,000 DWT
- D.Up to 60,000 DWT
Correct answer
Explanation
The correct answer is up to 45,000 DWT. Slipway-4 at Hindustan Shipyard Limited was extended and strengthened so that the yard could take on larger hulls, and the Defence Minister inaugurated the upgraded slipway on the same day he launched Surya and laid the keel of FSS-5. Alongside it he opened a 300-tonne Goliath Crane spanning Slipways 3 and 4, designed and manufactured by L and T Geostructure with Konecranes under Make in India, fitted with programmable controls, variable frequency drives, tandem lifting, remote diagnostics and condition monitoring. Options A and B are wrong because they understate the new limit, and a yard restricted to those sizes could not undertake the larger and more complex programmes the upgrade is meant to enable. Option D is wrong because it overstates the capacity. Pair the slipway figure with the crane figure, since both are standard one-mark facts from this event.
Read the full article: First Fleet Support Ship Surya Launched at HSL Visakhapatnam
Practice Questions
What is the name given to India’s first indigenously built Fleet Support Ship, launched in October 2026?
- A.Jala Usha
- B.Surya
- C.Varuna
- D.Samudra
Show answer
FSS-1, the first of the Fleet Support Ships designed and built by Hindustan Shipyard Limited, was named Surya and launched by Defence Minister Rajnath Singh at the Visakhapatnam yard on 6 October 2026.
Read the full explanation →Hindustan Shipyard Limited, where the first Fleet Support Ship was launched, is located in which city?
- A.Kochi
- B.Mumbai
- C.Visakhapatnam
- D.Kolkata
Show answer
Hindustan Shipyard Limited stands in Visakhapatnam in Andhra Pradesh, and it was there that Surya was launched into the Bay of Bengal, the keel of FSS-5 was laid and the upgraded Slipway-4 and the 300-tonne Goliath Crane were inaugurated.
Read the full explanation →Which laboratory carried out the hydrodynamic analysis and model testing of DSC A21 at the design stage?
- A.Naval Physical and Oceanographic Laboratory, Kochi
- B.Naval Science and Technological Laboratory, Visakhapatnam
- C.Aeronautical Development Establishment, Bengaluru
- D.Defence Metallurgical Research Laboratory, Hyderabad
Show answer
While DSC A21 was still on the drawing board, this laboratory carried out the hydrodynamic analysis and model testing that confirmed the twin-hull design would deliver the stability and sea-keeping expected of it.
Read the full explanation →What hull form does the newly delivered DSC A21 have?
- A.Single-hull displacement form
- B.Trimaran
- C.Catamaran
- D.Hydrofoil
Show answer
DSC A21 is built on a catamaran, or twin-hull, form, and this is the design feature the Navy highlighted. The form gives the craft greater stability, a larger deck area and better sea-keeping characteristics, which together make it suited to its specialist work of supporting divers.
Read the full explanation →Which shipbuilder designed and constructed the diving support craft DSC A21 delivered to the Indian Navy?
- A.Mazagon Dock Shipbuilders
- B.Titagarh Rail Systems Limited
- C.Cochin Shipyard Limited
- D.Goa Shipyard Limited
Show answer
The craft was indigenously designed and constructed by this Kolkata-based firm and handed over to the Indian Navy at Naval Dockyard, Mumbai, as part of the Diving Support Craft project.
Read the full explanation →