The five infrastructure projects reviewed at the 55th PRAGATI meeting were drawn from which sectors?
- A.Road, power, coal and railway
- B.Road, port, coal and railway
- C.Power, coal, telecom and railway
- D.Road, power, steel and shipping
Correct answer
Explanation
The correct answer is road, power, coal and railway. These four sectors supplied the five critical projects reviewed, and their combined cost was more than Rs 78,000 crore. Options B, C and D are wrong because they bring in sectors such as ports, telecom, steel and shipping, which were not part of this review. The sector mix matters because the Prime Minister gave separate directions for each: on the road project he asked for faster implementation with attention to outcomes rather than outlays; on the coal project he stressed that rehabilitation and resettlement must be timely and dignified; and on the power project he suggested innovative models for decentralised solar and wind generation located close to centres of consumption, so that reliable and affordable supply improves and the load on transmission infrastructure eases. Remember that PRAGATI reviews stalled or critical projects jointly with States rather than sanctioning fresh outlays.
Read the full article: 55th PRAGATI Meeting Reviews Rs 78,000 Crore Projects
Practice Questions
Which edition of the PRAGATI meeting did Prime Minister Narendra Modi chair on 25 November 2026?
- A.45th
- B.50th
- C.55th
- D.60th
Show answer
The Prime Minister chaired it at Seva Teerth, and PRAGATI is the ICT-enabled, multi-modal platform for Pro-Active Governance and Timely Implementation that brings the Central and State governments together on project delivery.
Read the full explanation →In the 3C approach to ITI education advocated at the 55th PRAGATI meeting, what do the three Cs stand for?
- A.Curriculum-Capacity-Certification
- B.Classroom-Company-Career
- C.Cluster-College-Contract
- D.Craft-Commerce-Career
Show answer
The approach links what a trainee learns in the classroom with practical experience inside a company, and then with employment and career progression, so that an ITI course ends in a job rather than only a certificate.
Read the full explanation →How many passengers will the Doloo airport terminal building be able to handle during peak hour?
- A.400
- B.600
- C.800
- D.1,200
Show answer
The approval sets a terminal building of 12,351 square metres with the capacity to handle 800 passengers in the peak hour, designed with modern amenities, sustainable green building principles and a modular layout so that it can be expanded as traffic grows.
Read the full explanation →What is the estimated cost of the Doloo greenfield airport project approved in November 2026?
- A.Rs 1,205 crore
- B.Rs 2,014 crore
- C.Rs 3,650 crore
- D.Rs 4,288 crore
Show answer
This is the estimated cost at which the Cabinet Committee on Economic Affairs approved the new greenfield airport at Doloo, Silchar, to be developed by the Airports Authority of India.
Read the full explanation →The greenfield airport approved by the CCEA at Doloo is in which state?
- A.Meghalaya
- B.Tripura
- C.Assam
- D.Manipur
Show answer
Doloo lies in the Cachar district of Assam, in the Barak Valley, and the Cabinet Committee on Economic Affairs approved a new greenfield airport there at an estimated cost of Rs 2,014 crore, to be built by the Airports Authority of India.
Read the full explanation →