Secondary timescales traceable to IST have been set up at Regional Reference Standard Laboratories in how many cities?

  1. A.Three
  2. B.Five
  3. C.Seven
  4. D.Nine

Correct answer

B. Five

Explanation

The correct answer is five. CSIR-NPL, ISRO and the Legal Metrology Department jointly established secondary timescales at Regional Reference Standard Laboratories in Ahmedabad, Bengaluru, Bhubaneswar, Faridabad and Guwahati. Each of these stays continuously traceable to the IST that CSIR-NPL maintains, which together creates a distributed national architecture for spreading the time. The point of spreading it is resilience: if dissemination depended on a single location, one failure would leave the country without a traceable reference. The five laboratories, along with ISRO's NavIC satellite system and the time dissemination infrastructure of NPL and NIC, add capacity and geographical diversity. Options A, C and D are not supported by the release. A memory aid is that the cities are spread across the west, south, east, north and north-east of the country.

Read the full article: Legal Metrology (Indian Standard Time) Rules 2026 Notified

Q4.NationalMedium

Which of the following categories of pending matters was taken up by the Ministry of Steel under SCDPM 6?

  1. A.Only internal departmental audit paragraphs
  2. B.Only court cases pending before tribunals
  3. C.References from MPs, the PMO, VIPs and the Cabinet, State Governments and CPGRAMS cases
  4. D.Only pending tender and procurement files
Show answer
Correct answer: C. References from MPs, the PMO, VIPs and the Cabinet, State Governments and CPGRAMS cases

The campaign set out to institutionalise Swachhta and to address pending matters across these several categories, which is why its reporting covers both paperwork and public grievances.

Q5.NationalMedium

Roughly how much office space did the Ministry of Steel free during SCDPM 6 through disposal of scrap, e-waste and redundant files?

  1. A.About 17,501 square feet
  2. B.About 21,164 square feet
  3. C.About 7,501 square feet
  4. D.About 1,750 square feet
Show answer
Correct answer: A. About 17,501 square feet

The ministry reported that approximately this much office space was released during the campaign by clearing scrap, electronic waste and files that were no longer required.