In the NRIDA study design, how long will the baseline survey conducted before road construction last?

  1. A.6 months
  2. B.14 months
  3. C.22 months
  4. D.36 months

Correct answer

B. 14 months

Explanation

The correct answer is 14 months. The assessment is built in three stages. First comes the baseline or pre-construction survey lasting fourteen months, then a transition period of roughly twelve months, and finally the endline or post-construction survey lasting twenty-two months. Because the same households and the same roads are revisited at each stage, the design is described as longitudinal and can show change over time rather than compare unrelated samples. Option A is shorter than the stated baseline period and is wrong. Option C is the length of the endline survey that follows construction, not the baseline, so it is a common trap. Option D is longer than any single stage in the design and does not match the plan at all. The full study runs for four years and will feed into programme review and future rural infrastructure planning.

Read the full article: NRIDA and IIM Kolkata Sign MoU on PMGSY-IV Impact Study

Q1.Government SchemesEasy

NRIDA signed an MoU for a four-year impact assessment of PMGSY-IV and PM-JANMAN roads with which institution?

  1. A.IIM Ahmedabad
  2. B.IIM Kolkata
  3. C.IIT Roorkee
  4. D.National Institute of Rural Development and Panchayati Raj
Show answer
Correct answer: B. IIM Kolkata

The National Rural Infrastructure Development Agency, which works under the Ministry of Rural Development, signed the Memorandum of Understanding with the Indian Institute of Management Kolkata for a four-year longitudinal study of roads built under PMGSY-IV and PM-JANMAN.

Q2.Government SchemesMedium

How many roads will the NRIDA impact assessment study cover?

  1. A.150
  2. B.200
  3. C.250
  4. D.500
Show answer
Correct answer: C. 250

The study will examine that many rural roads, spread across ten States and Union Territories, fifty districts and one hundred and fifty blocks, with a household survey of roughly five thousand families to capture changes in mobility, accessibility and socio-economic conditions.

Q3.Government SchemesHard

Which institution presented its Low Temperature Thermal Desalination technology, with eight plants in Lakshadweep, at the conference?

  1. A.National Institute of Ocean Technology
  2. B.Central Water Commission
  3. C.National Water Development Agency
  4. D.Central Ground Water Board
Show answer
Correct answer: A. National Institute of Ocean Technology

Its project director explained the indigenous Low Temperature Thermal Desalination technology, under which eight plants have been set up in Lakshadweep to give islanders safe drinking water with minimal damage to the environment, and also described an Ocean Thermal Energy Conversion project that pairs renewable power generation with desalination to…