How much time has been reserved at proof ranges for proof firing of developmental projects?
- A.One day per month
- B.Three days per quarter
- C.Five days per half-year
- D.Ten days per year
Correct answer
Explanation
The correct answer is three days per quarter. The revised procedure keeps this slot free at proof ranges for proof firing of developmental projects sponsored by the Government, including those under iDEX, the Technology Development Fund and the Make route along with other ministry projects, and also for developmental projects that the indigenous defence industry has taken up on its own initiative. That last inclusion matters, because a firm developing a product before it holds any order can still get range access. Options A, C and D describe other patterns of reserved time and do not match what was approved. The broader intent of the document is to make access to proof ranges, field firing ranges and test facilities simpler, transparent and industry-friendly, while supporting indigenisation, innovation and defence exports and giving proof and test support to industry-led development work.
Read the full article: Rajnath Singh Approves Revised SOP for MoD Proof Ranges
Practice Questions
Under the revised SOP approved in October 2026, proof and testing charges have been waived for which category of projects?
- A.Only foreign collaboration projects
- B.iDEX, TDF, Make and other MoD developmental projects
- C.Only projects of ordnance factories
- D.Only export orders above a fixed value
Show answer
The waiver of proof and testing charges for this set of projects is the central financial relief in the revised Standard Operating Procedure, and the stated reason is the promotion of self-reliance in defence.
Read the full explanation →What has replaced the arbitration provision in the revised Standard Operating Procedure?
- A.A Conciliation Agreement Clause
- B.A mandatory civil court reference
- C.An ombudsman for defence contracts
- D.A tribunal under the Ministry of Law
Show answer
The earlier procedure routed disagreements into arbitration, and the revised version replaces that with a simpler, industry-friendly conciliation clause so that problems faced by domestic manufacturers are settled faster, which the Ministry links to ease of doing business.
Read the full explanation →Which laboratory carried out the hydrodynamic analysis and model testing of DSC A21 at the design stage?
- A.Naval Physical and Oceanographic Laboratory, Kochi
- B.Naval Science and Technological Laboratory, Visakhapatnam
- C.Aeronautical Development Establishment, Bengaluru
- D.Defence Metallurgical Research Laboratory, Hyderabad
Show answer
While DSC A21 was still on the drawing board, this laboratory carried out the hydrodynamic analysis and model testing that confirmed the twin-hull design would deliver the stability and sea-keeping expected of it.
Read the full explanation →What hull form does the newly delivered DSC A21 have?
- A.Single-hull displacement form
- B.Trimaran
- C.Catamaran
- D.Hydrofoil
Show answer
DSC A21 is built on a catamaran, or twin-hull, form, and this is the design feature the Navy highlighted. The form gives the craft greater stability, a larger deck area and better sea-keeping characteristics, which together make it suited to its specialist work of supporting divers.
Read the full explanation →Which shipbuilder designed and constructed the diving support craft DSC A21 delivered to the Indian Navy?
- A.Mazagon Dock Shipbuilders
- B.Titagarh Rail Systems Limited
- C.Cochin Shipyard Limited
- D.Goa Shipyard Limited
Show answer
The craft was indigenously designed and constructed by this Kolkata-based firm and handed over to the Indian Navy at Naval Dockyard, Mumbai, as part of the Diving Support Craft project.
Read the full explanation →