How many regional routes has UDAN made operational in its first decade?
- A.687
- B.441
- C.368
- D.95
Correct answer
Explanation
The correct answer is 687. That is the number of regional routes put into service across the country in the ten years since the scheme began, and it sits alongside the other headline totals of the decade: more than 3.68 lakh flights and 1.72 crore passengers. Option B is wrong because about 441 is the count of aerodromes for which three years of operation and maintenance support is planned under the next phase, not routes already flying. Option C is wrong because it misreads the flight figure of 3.68 lakh services as a count of routes. Option D is wrong because 95 is the number of aerodromes brought into operation, a figure that includes 17 heliports and two water aerodromes, and an aerodrome usually serves several routes. Candidates should hold the two totals together, routes against aerodromes, since both are quoted for the same ten-year period.
Read the full article: UDAN Completes 10 Years, Modified UDAN Opens Next Phase
Practice Questions
On which date was the Regional Connectivity Scheme, UDAN, launched?
- A.21 October 2014
- B.21 October 2016
- C.27 April 2017
- D.4 July 2026
Show answer
The Regional Connectivity Scheme, named UDAN for Ude Desh ka Aam Nagrik, was launched on that day, and its promise of affordable yet commercially viable regional flying came out of the National Civil Aviation Policy adopted the same year.
Read the full explanation →What is the total outlay of the Modified UDAN scheme announced for the next phase?
- A.Rs 12,159 crore
- B.Rs 10,043 crore
- C.Rs 28,840 crore
- D.Rs 5,091 crore
Show answer
The correct answer is Rs 28,840 crore, the total provision for the next phase of the scheme launched on 4 July 2026 and running from FY 2026-27 to FY 2035-36.
Read the full explanation →Which UDAN airport has the longest runway in Bihar, at about 2.8 km?
- A.Deoghar Airport
- B.Tezu Airport
- C.Kishangarh Airport
- D.Purnea Airport
Show answer
Opened in 2025, it gave air access to more than ten districts of Bihar, cut the journey to Kolkata to about two hours and to Patna to roughly one, and it carries the state's longest runway at close to 2.8 km, long enough for A320 and B737 aircraft.
Read the full explanation →Which examination had Dr Shrikant Dilip Khandare qualified in June 2018 before his doctoral research?
- A.GATE
- B.CSIR-UGC NET
- C.ICAR NET
- D.CAT
Show answer
His research is directed at sustainable answers to environmental problems, with plastic waste and pollution at its centre, and the ministry has presented his case as an illustration of how timely financial support helps a scholar from a disadvantaged background stay in research.
Read the full explanation →What was the total assistance received by the scholar under the NFSC scheme, including House Rent Allowance?
- A.Rs 4.50 lakh
- B.Rs 6.60 lakh
- C.Rs 9.90 lakh
- D.Rs 12.50 lakh
Show answer
That is the total assistance received by Dr Shrikant Dilip Khandare under the National Fellowship for Scheduled Caste Students, made up of fellowship support together with House Rent Allowance, with payments beginning in October 2019.
Read the full explanation →