Skip to content
GK24

Banking GK Questions 2026

The static part of banking awareness is mostly banking and the economy; history and geography get a smaller share than in SSC exams. The test names say so: General/Economy/Banking Awareness including RBI circulars in IBPS PO, General Awareness/ Economy/ Banking Knowledge in SBI PO, and General/Financial Awareness in the clerk exams. Questions keep returning to the RBI and its functions, monetary policy tools such as the repo rate, CRR and SLR, types of banks and accounts, NPAs, KYC, priority sector lending, payment systems such as UPI, NEFT and RTGS, regulators such as SEBI, IRDAI and PFRDA, development institutions such as NABARD and SIDBI, the Budget and the Economic Survey. RBI Grade B and NABARD Grade A go further, with full papers on Economic and Social Issues, and NABARD on Agriculture and Rural Development: agronomy, irrigation, animal husbandry, climate change and rural development schemes. Some static GK still appears: headquarters and heads of banks, currencies and capitals, and important days. This page gathers GK24's topic-wise GK notes for banking exams, in English and Hindi, in short facts and tables. Read one topic at a sitting, then take its topic quiz to see what you remember.

Banking GK Questions with Answers

Q3042.Static GKMedium

Together We Can is the tagline of which bank?

  1. A.Canara Bank
  2. B.Corporation Bank
  3. C.Union Bank of India
  4. D.Central Bank of India
Show answer
Correct answer: A. Canara Bank

Canara Bank, founded at Mangaluru in 1906 by Ammembal Subba Rao Pai, uses Together We Can, and the line is easy to fix in memory because the last word repeats the bank's own name.

Q3045.Sports GKMedium

Which of the following is NOT a franchise-based league but a domestic tournament played between state or zonal teams?

  1. A.Pro Kabaddi League
  2. B.Ranji Trophy
  3. C.Premier Badminton League
  4. D.Ultimate Table Tennis
Show answer
Correct answer: B. Ranji Trophy

The Ranji Trophy, begun in 1934-35 and named after Ranjitsinhji, is India's premier first-class cricket championship, played between teams representing states and a few institutional sides selected by the BCCI, not between privately owned city franchises.

Q3046.Sports GKMedium

Which team won the first season of the Hockey India League in 2013?

  1. A.Delhi Waveriders
  2. B.Ranchi Rhinos
  3. C.Punjab Warriors
  4. D.Uttar Pradesh Wizards
Show answer
Correct answer: B. Ranchi Rhinos

The Hockey India League began in 2013 under Hockey India, and Ranchi Rhinos won the first final; the league was notable for buying the world's best players at auction and for bringing international hockey to Indian cities for several weeks each winter.

Q3052.Sports GKEasy

The Pro Kabaddi League was started in which year?

  1. A.2008
  2. B.2013
  3. C.2014
  4. D.2017
Show answer
Correct answer: C. 2014

The Pro Kabaddi League began in 2014, organised by Mashal Sports along with the Amateur Kabaddi Federation of India, and it was built deliberately on the franchise model of the IPL, with city teams, a player auction and a television contract.

Q3053.Sports GKMedium

Which team won the first season of the Indian Premier League?

  1. A.Chennai Super Kings
  2. B.Mumbai Indians
  3. C.Rajasthan Royals
  4. D.Deccan Chargers
Show answer
Correct answer: C. Rajasthan Royals

Rajasthan Royals, led by the Australian leg spinner Shane Warne, won the 2008 final against Chennai Super Kings at the Dr D. Y. Patil Stadium in Navi Mumbai, and they remain the only team to win the title in the league's first attempt with the smallest purse of that season.

Q3055.Computer AwarenessMedium

Testing a program only by giving inputs and checking the outputs, without looking at the internal code, is called:

  1. A.White-box testing
  2. B.Black-box testing
  3. C.Unit testing
  4. D.Regression testing
Show answer
Correct answer: B. Black-box testing

In black-box testing the tester treats the program as a sealed box, supplies inputs drawn from the specification and compares the outputs with what the specification promises; equivalence partitioning and boundary value analysis are its standard techniques, and no knowledge of the source code is needed.

Q3056.Computer AwarenessAsked in: Delhi · 7 Aug 2021, Shift 2Medium

Which of the following statements is/are correct regarding code walk-through in software development? I. It is an informal technique for analyzing code. II. It is performed just before coding the module.

  1. A.Neither I nor II
  2. B.Only I
  3. C.Both I and II
  4. D.Only II
Show answer
Correct answer: B. Only I

A code walk-through is an informal review technique: a few team members read a module line by line, mentally execute it on sample data and note the defects they find, without the checklists, metrics and formal records of an inspection.

Q3057.Computer AwarenessMedium

The spiral model of software development, which is driven by risk analysis in every loop, was proposed by:

  1. A.Winston Royce
  2. B.Barry Boehm
  3. C.Edsger Dijkstra
  4. D.Grady Booch
Show answer
Correct answer: B. Barry Boehm

Boehm described the spiral model, in which the project moves outward through repeated loops and each loop performs four activities: determining objectives, risk analysis and resolution, development and testing, and planning the next loop.

Q3058.Computer AwarenessAsked in: Delhi · 7 Aug 2021, Shift 2Medium

What is COUPLING in software design?

  1. A.Coupling is a measure of the degree of functional interdependence between two modules
  2. B.Coupling is a measure of the degree of functional non-dependence between two modules
  3. C.Coupling is a measure of the functional robustness of a software module
  4. D.Coupling is a measure of the degree of functionally connected dependence between two modules
Show answer
Correct answer: A. Coupling is a measure of the degree of functional interdependence between two modules

If one module must know the internal data or logic of another to work, the two are tightly coupled, and a change in one forces a change in the other.

Q3059.Computer AwarenessEasy

Which phase of the software development life cycle produces the Software Requirements Specification (SRS)?

  1. A.Requirement gathering and analysis
  2. B.Design
  3. C.Coding
  4. D.Maintenance
Show answer
Correct answer: A. Requirement gathering and analysis

This is the first phase of the SDLC: the team meets the users, records what the system must do and what constraints apply, and sets it all down in the Software Requirements Specification, which then becomes the agreed basis for everything that follows and the yardstick for acceptance testing.

Q3060.Computer AwarenessAsked in: Delhi · 7 Aug 2021, Shift 1Medium

What is the other name of Linear Sequential model in software engineering?

  1. A.Spiral model
  2. B.Prototype model
  3. C.Waterfall model
  4. D.RAD model
Show answer
Correct answer: C. Waterfall model

The Waterfall model is called the linear sequential model because the project flows in one direction through requirement analysis, design, coding, testing, deployment and maintenance, with each phase completed and signed off before the next begins and no overlap between them.

GK Questions for sub-exams